What changes when a fuel hauler takes a non-fuel bulk liquid load?
Four things change: the tank the product needs, the cleaning between products, the pump and hose on the truck, and the hazard paperwork. Everything else about bulk liquid hauling, from finding the load to getting paid for it, works the way fuel does.
This page covers the hauler’s side of the move; for which products exist, see industries. The table shows how the four changes land by product class. Read the cells as questions to settle before you bid. The product’s safety data sheet, the shipper and the regulations decide each one.
| Product class | Tank and equipment | Washout between products | Pump and hose | Placards and papers |
|---|---|---|---|---|
| Propane | A pressure tank, not a low-pressure fuel tank | Ask the shipper what it requires | Ask whether the truck brings its own pump; a bobtail is a common truck type | Look the product up in the hazmat table |
| Lubricants and DEF | Material compatibility with the product | Residue from the last load is the risk | Clean hose; the truck may need a pump to unload | Look each product up; do not assume by category |
| Chemicals | Set by the specific chemical: material, lining, tank spec | Compatibility and cleaning record | Confirm hose and gasket material suits the chemical | Per-product entry in the hazmat table |
| Agricultural liquids | Check the SDS for material compatibility | Cross-contamination between products | Confirm pump need and hose material | Look each product up in the table |
Say you run a DOT 406 tank on fuel today and a shipper asks about a chemical load. Four questions decide whether you can bid: is the product allowed in your tank, what was in the tank last, can your pump and hose handle it, and do your driver and your papers cover its hazard class. If any answer is “not sure”, that is your answer for now.
Does the tank spec change?
Yes. The tank has to be built for the product, and a fuel tank is not built for everything.
Fuel moves in low-pressure cargo tanks. A DOT 406 tank, for example, has a maximum allowable working pressure of no lower than 2.65 psig and no higher than 4 psig under 49 CFR 178.346-1. The general requirements for 406, 407 and 412 tanks sit in 49 CFR 178.345-1. If you want the fuel-side comparison first, read MC-306 vs. DOT-406.
Propane is different in kind. It is a gas under pressure, so it needs a pressure tank built and stamped to the ASME code under 49 CFR 178.337-1, and 49 CFR 173.315 requires that the product’s vapor pressure at 115 degrees F not exceed the tank’s design pressure. A fuel trailer cannot be re-pointed at it.
For chemicals the tank question is usually about material. Which metal or lining the tank is made of, and which gaskets it carries, depends on the chemical. The same goes for some fertilizers. A tank that is fine for gasoline may not be fine for a corrosive.
For the fuel version of tank capacity, see how many gallons a fuel tanker holds.
Do you have to wash the tank between products?
Often, and outside fuel the previous cargo can matter more. Settle who pays for the wash before you bid.
Lubricants and DEF are sensitive to contamination, so ask the shipper what residue, if any, it will accept. Chemicals can react with each other or with what is left in the tank. Agricultural liquids raise cross-contamination worries between crop-protection products.
So before you bid, ask what the last load was and what the shipper requires for cleaning. Build the washout time, the wash facility and any cleaning record into your price, because an hour at the wash rack is an hour the truck is not earning. A split-load is a related trap: putting two products in one trip needs compartments and a delivery plan that keep them from touching, and you should ask whether the two products may share a trailer at all.
Do the pump and hose change?
Yes, and it shows on the order. Outside fuel, the order may require the truck to bring its own pump.
A bobtail is a different truck than a fuel transport. A lubricant or DEF drop may need your pump. Chemicals and farm liquids may need hose and gasket material that suits the product, and need a hose that has been cleaned of the last product.
Settle two things before every non-fuel load: does the truck bring its own pump, and what is on the end of the hose? Get it wrong and you arrive at the customer and cannot unload.
Do placards and shipping papers change?
Yes, per product. The hazmat table in 49 CFR 172.101 lists each regulated material with its hazard class and identification number, and that drives the placards on the truck and the entries on the shipping papers. Some of the products on this page are in the table and some are not, so look up each one by its proper shipping name rather than by category.
Fuel haulers already know the pattern; for how it works on fuel, read fuel hazmat placards and shipping papers. The new work is that the hazard class, the placard and the shipping description differ with every product, and your driver’s training and endorsements have to cover the one you take. The bill of lading for a chemical load has to carry the right description, so check it against the table before the truck leaves.
What stays the same?
The business side. You still find a load, price it, haul it, prove delivery and invoice it. The load board, delivery documents and invoices you use for fuel carry over to these products. If you already work from a fuel board, fuel tanker load boards covers how to read one.
How Energy Connect handles it
Before you bid, the order shows whether the truck must bring its own pump and, if the poster set one, the truck type the load needs (a bobtail, for example).
On a chemical load, the truck type, pump requirement and delivery notes are on the order, so you read them before you bid, and the bill of lading and delivery documents stay on that same order. You bid on a posted load and the poster accepts or declines. A bid quoted as a freight rate can also be countered; a bid priced off an index or terminal can only be accepted or declined. You record dispatch, pickup, transit and delivery on the load and attach the bill of lading and other delivery documents to it.
The order carries the poster’s requirements. Whether your tank, washout, hose and training fit the product is still your call.